Quantum AML/2 Betriebsanweisung Seite 66

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 66
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 65
B-2 Actual Scenario
600135-E
ADIC recommends that the movement and placement of the
steel be scheduled to coincide with the time that the robots
and all tape drives are in a quiescent state during steel
movement.
AIDC consensus on reteaching drive position: If there is no
significant vibration, the reteaching will most likely not be
necessary.
ADIC Question: Should the robotic arms be braced during the
time the steel is being moved?
Dust Scenario
The user’s plan states: The work planned is the construction
of a plastic sheet wall, slab to slab near the ODC library. This
will protect the equipment from dust while a sheetrock slab to
slab wall is built parallel to it that will comprise a UPS system.
The plastic wall will remain until the sheetrock wall is 100%
complete.
ADIC Question:
Do you have plenum cooling in the AML areas?
Are there plenum cooling vents under the drive cabinets
or under the library?
Seitenansicht 65
1 2 ... 61 62 63 64 65 66

Kommentare zu diesen Handbüchern

Keine Kommentare