Chapter 2 Basic Library Operations
Preparing the Library for Operation
22 ATL P2000 Series Automated Tape Library User’s Guide
Preparing the Library for Operation
2
To prepare the library for operation:
•
Close the library door and access panels
•
Connect the host workstations
Closing the
Library Doors and
Access Panels
2
The library has one front door and one back access panel.
1
Close and lock the front door.
a
Turn the door latch to secure the door to the library frame.
b
Lower the latch over the door lock.
c
Using the key from the accessory kit, lock the latch in place.
d
Using the key from the accessory kit, lock the latches in
place.
2
Close and lock the back access panel using a 5/32 hex wrench
(not provided).
Connecting Host
Workstations
2
Connect the SCSI cables and jumpers as shown in the applicable
figures.
Figure 13
and figure 14 on the following pages show the
recommended cabling configurations for the 10-drive and 8-drive
library, respectively.
Note:
ATL ships sufficient SCSI cables and terminators with
this library to set up two-drives per SCSI bus, as well as
adequate SCSI jumper cables to accommodate up to 4
drives per SCSI bus.