Appendix B Relocating the Library
Checking the New Installation Site
86 Quantum|ATL P3000 Series User’s Guide
To move the library to a new location within the same building or
facility, follow all instructions in this appendix except for those
found in Crating the Library
on page 94.
Checking the New Installation Site
2
Check the new installation site for the library using the guidelines
found in the ATL P2000/P3000/P6000 Pre-Installation Site Survey
Instructions. Make sure the new location meets all applicable
clearance, environmental, and power requirements.
Preparing the Library for Relocation
2
You will need the following tools to prepare the library for
relocation:
• #2 Phillips head screwdriver
• 3/16-inch Allen wrench
Take the following steps to prepare the library for relocation:
• Removing tape cartridges
• Installing internal packing materials
Note:
These procedures require the original packing materials
of the library. If you do not have the original packing
materials, contact the ATL Customer Support
Department.
Caution:
Moving or shipping the library without proper
packing materials can result in damage to library
components.
Kommentare zu diesen Handbüchern